MANUFACTURING

Production evidence from the Taiheng archive.

The current materials document factory buildings, production equipment, heat-treatment equipment, gears, shafts, assembled units and stored products.

Taiheng gearbox production workshop

WORKFLOW

From duty review to inspection.

01

Application review

Confirm load, speed, ratio, mounting and operating environment before finalizing the configuration.

02

Gear production

Machine shafts and gears to the approved drawings and material requirements.

03

Heat treatment

Apply the specified carburizing, quenching or tempering process for the selected gear set.

04

Assembly and inspection

Check fits, shaft movement, sealing, lubrication and no-load operation before packing.

QUALITY DOCUMENTATION

Current certificates will be published only after validity review.

The source archive contains historical quality certificates, inspection reports and industry honours. Their dates and scope require confirmation before public display, so this first version describes the documented process without presenting expired credentials as current.

PROJECT REVIEW

Need a modified shaft, housing or mounting arrangement?

Discuss a custom gearbox